Projects

Underway

Sanford Mall Phase I area
Site improvements are planned for this area of campus that previously housed the Lucy Brock building site. Pre-qualification of contractors is underway, design is nearing completion and bids will be received in May 2014. Cole Jenest Stone is the landscape architect. Construction will begin Summer of 2014 and be completed Winter 2014.
Sanford Mall Phase II
This project involves significant site improvements to the main open space on campus.  Designer selection is underway with submittals received on February 24, 2014.  Construction is anticipated to begin Summer 2015.
Lot where College Health Sciences will be built.
This new building is planned for the allied health professions.  It is a 200,000 GSF facility.  Design is underway and LS3P is the architect.
Area of work from above
This two-phase project includes the repair/replacement of steam and condensate lines along Rivers Street. Phase I will be completed Summer 2014 and Phase II will be completed Summer 2015.  Bids for Phase I will be received in April 2014.  The engineer of record is RMF.
Bodenheimer Drive Steam Project
This project includes the repair/replacement of steam and condensate lines along Bodenheimer Drive.  The engineer of record is Stanford White.  Construction will begin Summer 2014.
Recreation Fields at State Farm
Drainage improvements to the existing fields is the focus of this project.  Working with the Army Corps of Engineers and the Town of Boone, it is anticipated that this project will utilize spoils from the stream improvements being undertaken by the Army Corps of Engineers.  Construction depends on the schedule for the stream project, but is anticipated to occur Summer 2014.
Valborg Theatre Entrance
The project consists of improvements to the building entrance to address water infiltration.  Construction will occur over the Summer of 2014.  Mathews Architecture is the architect of record.  Greene is the contractor.
East Residence Hall
This project will install new sprinkler system throughout the residence hall. Construction will begin May 2014 and be completed over the Summer of 2014. Clancy + Theys is the contractor.  Clancy +Theys was the low bidder with a bid of $550,576.  The total project budget is $735,617.  Preliminary work has already begun, but when the students vacate the building in May, construction will commence full bore.  LS3P is the architect of record.
Field Hockey Stadium
Conversion from the existing soccer field to a field hockey field is underway. The low bidder was Construction Sports Associates with a bid of $1,425,000.  The total project budget is $1,500,000.  The project began construction in Fall 2013, but the weather delayed completion.  Construction activities will restart April 2014 and be completed Summer 2014.  CHA Consulting is the designer of record.
Campus Energy Savings
This project includes energy savings improvements to multiple campus facilities, including lighting replacements, fume hood replacements, HVAC efficiencies, and a new data center for the campus.  This project is underway and will continue until Summer 2015.

Submit a Work Request in AiM

aim

How may we help you?

I need..

Contact

Planning, Design and Construction
ASU Box 32050
438 Academy Street
BB Dougherty Admin. Buildling
Boone, North Carolina 28608
828.262.7195

Contact

Physical Plant
265 Dale Street
PO Box 32105
Boone, NC 28608-2105
Phone: 828.262.3190

Fax: 828.262.4017

QEP Global Learning


Advanced